Press Start-up Sequence

1)
Press the rear panel AC breaker switch to ON.
See Figure 5-1.
2) The front panel POWER light (See Figure 5-2.) will
flash GREEN a few times, then will glow a steady
.
GREEN
The display's initial screen identifies the Dukane iQ
Integrated Press and its major components.
The start-up sequence ends when the OPERATE
screen is displayed.
Dukane Manual Part No. 403-594-02
(ON)
(OFF)
Figure 5–1
Rear Panel AC Breaker Switch
NOTE
Press, acoustic stack, and tooling will
require their own individual adjustments as
those components are integrated into your
particular system.
Helpful information on a wide variety of
assembly equipment, processes and
techniques can be found at the Dukane
website:
http://www .dukane .com/us/PPL_upa .htm
POWER
Figure 5–2
Front Panel with Power On Light
Section 5 - Operation
Power On Light
ABORT
TRIGGER
Page 49