Sungrow SG3KTL-EC User Manual page 57

3g grid-connected inverter
Table of Contents

Advertisement

User Manual
3.
Lead the DI connection cables through the Thread-Lock Sealing Nut and the
cable gland.
4.
Strip off the DI cables as shown below.
No.
Description
A
Protective layer
Length of insulation to be
B
stripped off
Length of protective layer
C
to be stripped off
5.
Assemble the individual insulated conductor into corresponding pin of the
six-pole plug with a suitable screwdriver and pull cables outwards to confirm
whether they are installed firmly.
Remark
Accepted cable external diameter ranges from
4 mm to 8 mm.
7 mm
60 mm
5 Electrical Connection
47

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sg5ktl-ecSg6ktl-ecSg4ktl-ec

Table of Contents