7 Commissioning
6.
Configure time according to the local time.
Time setting is very important, which directly
affects data logging. Press
and Press
the settings by Pressing ENTER. The date
format is YY/MM/DD. YY, MM, and DD stand
for year, month, and day respectively. The
time format is hh/mm/ss. hh, mm, and ss
stand
for
respectively.
If inverter's commissioning fails, the "FAULT" indicator will be lit and "fault" will occur
on the display. Press
malfunction and then repeat starting up inverter as the above procedures.
60
to scroll up time value. Confirm
hour,
minute,
to view "current fault" information. Remove the existing
to move cursor
and
second
User Manual