Second Protective Earth Terminal - Sungrow SG3KTL-EC User Manual

3g grid-connected inverter
Table of Contents

Advertisement

5 Electrical Connection
User Manual
Where there is only one inverter in the PV power system, connect the "PE" cable to
the installation ground.
Where there are multiple inverters in the PV power system, connect the "PE" cables
of all inverters and mounting frame of PV arrays to the same copper bus bar. In this
way, they are in equipotential connection.
Fig. 5-3 Grounding of Inverter

5.6.2 Second Protective Earth Terminal

The inverters are equipped with second protective earth terminal as specified in EN
50178.
Second PE Terminal
There is a PE terminal on the right side of the inverter. You may choose to connect
the PE.
38

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sg5ktl-ecSg6ktl-ecSg4ktl-ec

Table of Contents