Adding A New Schedule; Showing The Next Schedule; Scheduler Example; Editing And Saving A Schedule - Siemens SIMATIC PCS 7 OSx Operator's Manual

Hide thumbs Also See for SIMATIC PCS 7 OSx:
Table of Contents

Advertisement

Adding a New
Schedule
Showing the Next
Schedule

Scheduler Example

Editing and Saving
a Schedule
SIMATIC PCS 7 OSx 4.1.2 Operator
To add a new schedule for a currently displayed report, select
the bottom of the Report Scheduler. A new Scheduler appears.
When the operator enters the Report Scheduler, information about the
currently selected report appears. To view another schedule associated with
the Report Format, select
(Figure
9-9).
Figure 9-9
depicts the report S_DEVIC, which is scheduled to begin running
at 5:00 A.M. on August 31, 1994. Additional reports, also with the same
name but with different version numbers, run every fourteen days starting
from September 14, 1994, and ending December 6, 1998, at 20:00 military
time. The report also runs when the active bit transitions from one to zero
for the status attribute assigned to the AI_57 tag.
To edit a schedule, select a report format from the top of the Scheduler.
Enter the new times and/or event; then select the
returns to the schedule for additional editing.
Figure 9-9 Showing the Next Schedule
at the bottom of the Report Scheduler
Show Next
at
Add New
pushbutton that
Save
Reports
9-15