SIMATIC PCS 7 OSx 4.1.2 Operator
When Role_Change to Primary Executes This command is only
executed when the following conditions are true.
•
The selected OSx station is not in the process of resynchronizing.
•
The selected OSx station is not out of sync.
•
The selected OSx station is a supervisory station.
Or,
•
The selected OSx station is not in the process of resynchronizing.
•
The selected OSx station is not out of sync.
•
The selected OSx station is an operator station, but there are no active,
non-resynchronizing supervisory stations that are in sync to choose.
Or,
The selected OSx station is not in the process of resynchronizing.
•
The selected OSx station is not in sync, but there are no active,
•
non-resynchronizing supervisory stations that are in sync to choose.
•
The selected OSx station is either a supervisory or an operator station.
And,
•
No other OSx station in the system is synchronizing to the primary.
•
All BCL/RDT programs have gone idle during the role-change waiting
period.
All reports have finished executing during the role-change waiting
•
period.
When Role_Change to Backup Executes This command is only
executed when the following conditions are true.
No OSx station in the system is synchronizing to the primary.
•
The selected OSx station is not out of sync.
•
The selected OSx station is a supervisory station.
•
•
The local OSx station has an active primary in its database.
2-15
OSx Station Control