Lead Compensation - AEMC 6526 User Manual

Megohmmeter
Hide thumbs Also See for 6526:
Table of Contents

Advertisement

2.3.3.1 Lead Compensation

Before checking continuity, you should compensate for the resistance of the measurement leads. This
ensures that the resistance measurement excludes the resistance in the leads. To do this, set the rotary
switch to
> 2s
The display changes to zero and the
from all continuity measurements. If the resistance of the leads is >10Ω, there is no compensation. The compensation
remains in memory until the instrument is turned OFF.
If the leads are changed with no change of compensation, the display may become negative. The instrument reports that
the compensation must be redone by displaying a blinking
To remove the compensation of the leads, leave the leads open and press the
plays the resistance of the leads and the
22
1.800.561.8187
Ω. Then short-circuit the measurement leads and press the
symbol is displayed. The resistance of the leads will be systematically subtracted
symbol goes off.
www.
symbol.
button for >2 seconds. The LCD dis-
Megohmmeter Model 6526/6532/6534
information@itm.com
.com
button for >2 seconds.
M
mA

Advertisement

Table of Contents
loading

This manual is also suitable for:

65326534

Table of Contents