Required Tools
The following tools are required for repair of E4980A.
Table 6-1
Required Tools
Assembly
3/4 Rack Module Top
A3 Analog Daughter Board
A2 Analog Board
Front Panel Assembly
Option Interface
PPMC PCA
A1 Mother Board
Power Supply Assembly
Base Plate
Rear Panel Assembly
FAN Assembly
GPIB Cable
Power Inlet Assembly
PCA E4980 USB
Binding Post Sgl
Inverter
Front Panel, Key Pad, and Key Flex
Circuit
Display Interface
Chapter 6
Torque screwdriver
T6
T8
T10
T20
Replacement Procedure
Required Tools
Box torque wrench
5.5 mm
7 mm
3/8 in.
5/8 in.
89