Initiate Node - HP E4418B Programming Manual

Power meters
Hide thumbs Also See for E4418B:
Table of Contents

Advertisement

TRIGger Subsystem

INITiate Node

INITiate Node
This command node allows you to place the power meter in the
"wait-for-trigger" state.
The INITiate commands are overlapped, that is, the power meter can
continue parsing and executing subsequent commands while initiated.
Refer to IEEE 488.2, section 12 for further details. Note that the pending
operation flag is set when the power meter moves out of the "idle" state
and is cleared when it re-enters the "idle" state.
The commands associated with this node are:
INITiate[1|2][:IMMediate]
INITiate[1|2]:CONTinuous <Boolean>
12-4
HP E4418B/E4419B Programming Guide

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E4419b

Table of Contents