3.2 Tool and Equipment Requirements
Common hand tools, supplemented by the following items, are required
for installation of the AdeptThree and any options or end effectors:
•
Drill motor, 1/2 inch drive
•
Masonry bit, 7/8 inch
•
Ratchet handle, 1/2 inch drive
•
Socket, 3/4 inch x 1/2 inch drive
•
Spirit level
•
Torque wrench, 1/2 inch drive, 100 foot-pound capacity
•
Vacuum cleaner
•
Pallet jack (or forklift)
•
Hydraulic lift with dual-leg sling (both rated for 700 pounds
kg] minimum)
•
Mounting plate (or spool)
3.3 Unpacking and Inspection
Before Unpacking
Carefully inspect all shipping crates for evidence of damage during
transit. Pay special attention to tilt and shock indication labels on the
exteriors of the containers. If any damage is indicated, request that the
carrier's agent be present at the time the container is unpacked.
Upon Unpacking
Compare the actual items received (not just the packing slip) with your
equipment purchase order and verify that all items are present and that
the shipment is correct.
Inspect each item for external damage as it is removed from its container.
If any damage is evident, contact Adept at the numbers listed in Chapter
1.
Retain all containers and packaging materials. These items may become
necessary to settle claims or, at a later date, to relocate equipment.