Installing and Connecting B5 Redundant Power Systems
Unpacking the Shelf and Power Supply
The shelf and the power supply are shipped separately. To unpack these devices proceed as
follows:
1.
Open the box and remove the packing material protecting the shelf or power supply.
2.
Verify the contents of each carton and compare the contents shipped with those listed in
Table 2‐1, Table 2‐2, and Table
3.
Perform a visual inspection of the switch devices for any signs of physical damage. Contact
Enterasys Networks if there are any signs of damage. Refer to "Getting Help" on page xvii for
details.
Table 2-1 Contents of STK-RPS-150CH2 Carton
Item
STK-RPS-150CH2
Quick Reference
Release Notes
Table 2-2 Contents of STK-RPS-150CH8 Carton
Item
STK-RPS-150CH8
Quick Reference
Release Notes
Table 2-3 Contents of STK-RPS-150PS Carton
Item
STK-RPS-150PS 150 watt DC power supply
USA, NEMA power cord
RPS cable
Notice card
Installing an STK-RPS-150PS
When you receive your STK‐RPS‐150CH2 or STK‐RPS‐150CH8 shelf, a coverplate will be in place
over each power‐supply slot.
To install the power supplies, refer to Figure 2‐7 or Figure
1.
Place the chassis on a sturdy flat surface where you plan to install power supplies.
2.
Align the power supply with one of the slots, then slide the power supply forward until its
front panel is flush against the chassis front panel.
2-12 Installation
Caution: Observe all Electrostatic Discharge (ESD) precautions when handling sensitive electronic
equipment.
Precaución: Al trabajar con equipos electrónicos sensibles, tome todas las precauciones de
seguridad para evitar descargas de electricidad estática.
Note: To prevent EMI leakage from the shelf, keep coverplates installed over any empty power
supply slots.
2‐3.
2‐8 and proceed as follows:
Quantity
1
1
1
Quantity
1
1
1
Quantity
1
1
1
1