Installing and Connecting B5 Redundant Power Systems
On certain switches, an LED indicator will show that a redundant power supply is now in 
operation.
.
Figure 2-11
1
Redundant power supply connector
Figure 2-12
1
B5 switch
2
RPS cable
3
STK-RPS-150PS redundant power supply
connector
4.
On certain switches, an LED indicator will show that a redundant power supply is now in 
operation.
.
This completes the installation.
2-18 Installation
Note: No change in switch configuration is necessary for this installation.
Power Connectors on STK-RPS-150PS (rear view)

STK-RPS-150PS RPS Cable and AC Power Cord Connections

Note: No change in switch device configuration is necessary for this installation.
2
AC power connector
4
B5 switch redundant power supply connector
5
AC power cord (type varies depending on country)
6
AC power outlet with ground connection
(type varies depending on country)