Required Tools

Required Tools

A Phillips screwdriver is required to install the switch into a rack.

Unpacking the Switch

Unpack the switch as follows:
1.
Open the box and remove the packing material protecting the switch.
2.
Verify that the contents of the carton contains the items listed in the table below.
Item
B5 switch
Mounting kit, consisting of two mounting brackets and eight M3x6-mm screws for rack
mounting
Rubber feet with adhesive backing for installation on a flat surface
AC power cord (The type of power cord is country dependent.)
DB9 female-to-DB9 female Console Cable
Quick Start Guide
3.
Remove the tape seal on the non‐conductive bag to remove the switch.
4.
Perform a visual inspection of the switch for any signs of physical damage. Contact 
Enterasys Networks if there are any signs of damage. Refer to "Getting Help" on page xvii for 
details.

Installing the Switch on a Flat Surface

When installing the switch on a flat surface, the installation of the rubber feet is recommended to 
prevent the switch from sliding on a flat surface. For instructions to rack mount the switch, 
proceed to "Rack Mounting the Switch" on page 2‐4.

Installing the Rubber Feet

To install the rubber feet, refer to Figure
1.
Place the switch on its back on a sturdy flat surface to gain access to the bottom of the chassis. 
2.
Remove the four rubber feet from their plastic bag in the shipping box.
2-2 Installation
Note: Do not install the rubber feet if you are going to rack mount the switch.
2‐1 and proceed as follows:
Quantity
1
1
4
1
1
1