Stk-Rps-150Ps Installation In An Stk-Rps-150Ch2 Shelf - Enterasys B5G124-24 Hardware Installation Manual

Enterasys b5 series
Hide thumbs Also See for B5G124-24:
Table of Contents

Advertisement

3.
Fasten the power supply to the chassis using the captive screws on the PSM front panel.
4.
Repeat steps 2 and 3 for each additional power supply.
5.
Proceed to "Installing the Shelf into the Rack" on page 2‐15 for the rack mount installation 
instructions.
Figure 2-7

STK-RPS-150PS Installation in an STK-RPS-150CH2 Shelf

1 STK-RPS-150CH2 shelf
2 STK-RPS-150PS power supply
Installing and Connecting B5 Redundant Power Systems
3 Shelf power supply slot
4 Captive screws (2)
Enterasys B5 Gigabit Ethernet Switch Hardware Installation Guide 2-13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents