Fujitsu ETERNUS DX100 S4 Basic Operation Manual page 87

Hybrid
Hide thumbs Also See for ETERNUS DX100 S4:
Table of Contents

Advertisement

Chapter 5
Component Expansion/Function Enhancement
5.2
Installing Additional Drive Enclosures
(7)
Attach the flange cover.
High-density drive enclosures (for regions other than the EMEIA, North American, Central American,
and Caribbean regions)
(1)
Adjust the sizes of the rack rail (for left side) and the rack rail (for right side) to fit the rack.
Pull the rail lock lever in the direction of the arrow and unlock it to adjust the length of the rack
rails to match the distance between the front and the rear rack pillars. Leave the rail lock lever
unlocked because the rail lock lever is locked after the rack rail is installed.
(Rack pillar: front)
FUJITSU Storage ETERNUS DX100 S4/DX200 S4, ETERNUS DX100 S3/DX200 S3 Hybrid Storage Systems Operation Guide (Basic)
Rail lock lever
Unlock the levers to adjust the length of the
rack rails to match the distance between the
front and rear rack pillars.
[Left]
[Right]
87
Copyright 2017 FUJITSU LIMITED
Rack rail (left)
"Left" is on the exterior
Rack rail (right)
"Right" is on the exterior
(Rack pillar: rear)
P3AM-7662-09ENZ0

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eternus dx200 s4Eternus dx100 s3Eternus dx200 s3

Table of Contents