Fujitsu ETERNUS DX100 S4 Basic Operation Manual page 85

Hybrid
Hide thumbs Also See for ETERNUS DX100 S4:
Table of Contents

Advertisement

Chapter 5
Component Expansion/Function Enhancement
5.2
Installing Additional Drive Enclosures
Insert the M5 screws in the 1st and 6th holes on the front rack pillars above the base line and in
the 2nd and 5th holes on the rear rack pillars above the base line to fasten the rack rails.
Second screw
(3)
Tighten the M4 screws of the rack rails that were slightly unscrewed in
(4)
Install the drive enclosure in the rack.
FUJITSU Storage ETERNUS DX100 S4/DX200 S4, ETERNUS DX100 S3/DX200 S3 Hybrid Storage Systems Operation Guide (Basic)
Front view of drive enclosure
[Left]
Sixth screw
(M5 screw)
2U
First screw
(M5 screw)
Bottom position of
drive enclosure
Rack rail
Rear view of drive enclosure
[Left]
Fifth screw
(M5 screw)
2U
(M5 screw)
Bottom position of
drive enclosure
Rack rail
Do
When installing or removing the drive enclosure to or from the rack,
-
make sure that the sides and the bottom of the drive enclosure are
held by two or more people. Failure to do so may cause injury.
Copyright 2017 FUJITSU LIMITED
[Right]
Sixth screw
(M5 screw)
First screw
(M5 screw)
[Right]
Fifth screw
(M5 screw)
Second screw
(M5 screw)
85
Step
(1).
P3AM-7662-09ENZ0

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eternus dx200 s4Eternus dx100 s3Eternus dx200 s3

Table of Contents