Chapter 3 Unpack And Installation - OSEE BCM-156-3HSV User Manual

Bcm series
Table of Contents

Advertisement

Chapter 3 Unpack and Installation

Unpack:
When unpacking the components of BCM-156 monitor, please verify that none
of the components listed in Table 3.1 are damaged or lack. If there is any
missing, contact your distributors or Osee Technology Co., Ltd. for it.
No.
1
2
3
4
5
6
7
Installation:
Prepare for installation
1.
Please follow the procedures below before installing BCM-156:
Check the equipment for any invisible damage that may have occurred
during transit.
Confirm all the items listed on the packing list have been received.
Remove all the packing material including electrostatic-resistant
packing.
Retain these packing materials for future use.
Mount a BCM-156 in your desired location of a standard rack.
2.
Adequate ventilation is required when installed to prevent possible
damage to the BCM-156.
Connect required cables for signal input and output. For BNC
3.
connections use 75Ω rated connectors.
Connect 12V5A DC power source using the included power cord.
4.
Connect the power cord to the power interface.
5.
Fasten the power protect accessory.
6.
Table 3-1 Packing List
Item
Device
Pedestal with screws
Power cord
adapter
User manual
Warranty card
Certificate card
Unpack and Installation
Quantity
1
1
1
1
1
1
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents