Chapter 3 Unpack And Installation - OSEE LCM215-HDR PLUS User Manual

Table of Contents

Advertisement

Chapter 3 Unpack and Installation

Unpack:
When unpacking the components of LCM215-HDR+ monitor, please verify that
none of the components listed in Table 3.1 are damaged or lack. If there is any
missing, contact your distributors or Osee Technology Ltd. for it.
No.
1
2
3
4
5
6
Installation:
Prepare for installation
1.
Please follow the procedures below before installing LCM215-HDR+ :
Check the equipment for any invisible damage that may have occurred
during transit.
Confirm all the items listed on the packing list have been received.
Remove all the packing material including electrostatic-resistant
packing.
Retain these packing materials for future use.
Mount a LCM215-HDR+ in your desired location. Adequate
2.
ventilation is required when installed to prevent possible damage
to the LCM215-HDR+.
There are screw holes at the rear panel of the monitor, which are
labeled in the following figures. Assemble the parts of the stands, then
insert the stands into the case, and fasten it with the screws provided.
The stands installation for LCM215-HDR are as follows:
Table 3-1 Packing List
Item
Device
Stands with screws
Power cord
User manual
Warranty card
Certificate card
7
Unpack and Installation
Quantity
1
2
1
1
1
1

Advertisement

Table of Contents
loading

Table of Contents