Installation
CAUTION
PE CONNECTION
2
2
The metal pins in the corners of the electronic part and
the holes on the corner of the installation box are
essential for the protective earth connection. Make sure
that they are not loosened, removed, or violated in any
way. Tightening torque requirement is 3 Nm. See
Illustration 2.18.
Illustration 2.18 PE Connection between the Installation Box
and the Electronic Part
NOTICE
The external grounding terminal is available as an
accessory (part no: 130B5833).
22
®
VLT
Decentral Drive FCD 302
Danfoss A/S © 05/2016 All rights reserved.
MG04F402
Need help?
Do you have a question about the VLT Decentral Drive FCD 302 and is the answer not in the manual?
Questions and answers