Checking The Shipment - Keysight E5061B Installation Manual

Network analyzer
Hide thumbs Also See for E5061B:
Table of Contents

Advertisement

1
Installation

Checking the Shipment

WA R N I N G
N O T E
18
After you receive the analyzer, carry out checks during
unpacking according to the following procedure.
When unpacking the analyzer, if the exterior of the analyzer (such
as the cover, front/rear panel, LCD screen, power switch, and port
connectors) appear to be damaged during transport, do not turn
on the power switch. Otherwise, you may get an electric shock.
Step 1.
Check that the packing box or shock-absorbing
material used to package the analyzer has not been
damaged.
If the packing box or shock-absorbing material has been damaged, leave the
packing box and shock-absorbing material as is until other inspection items
are checked as follows.
Step 2.
Check the packaged items supplied with the
analyzer for any damage or defects.
Step 3.
By referring to the furnished contents list, check
that all packaged items supplied with the analyzer have been
received as per the specified options.
Step 4.
After checking, if one of the following applies,
contact your nearest Keysight Technologies sales and service
office.
The packing box or shock-absorbing material used to
1
package the analyzer has been damaged or the
shock-absorbing material has traces where extreme force
has been applied.
A packaged item supplied with the analyzer has
2
mechanical damage or defects.
3
A packaged item supplied with the analyzer is missing.
4
A fault has been detected in the subsequent operation
check of the analyzer.
If an abnormality is detected in step 1, contact the
company that transported the analyzer as well as your
nearest Keysight Technologies sales and service office. For
Network Analyzer

Advertisement

Table of Contents
loading

Table of Contents