Branch Box; Installation The Unit - Fujitsu AUYG07LVLA Design & Technical Manual

Hide thumbs Also See for AUYG07LVLA:
Table of Contents

Advertisement

3-3.

BRANCH BOX

INSTALLATION THE UNIT

Perform installation in a location which can properly withstand the weight of the unit. Failure to
install in a robust location or a faulty installment may cause the equipment to fall, a water leakage,
electric shock or fire.
During installation, secure the hanger bolt so it does not come off.
Be sure to provide adequate maintenance space when installing the unit above the ceiling.
Changing the positioning of the control box
Change the positioning of the control box on-site before performing the installation.
The positioning of the control box can be changed.
(Only when installed horizontally. When vertically installed, the positioning cannot be changed.)
To the opposite side
(1) Remove the screws (2 pieces) to remove the
wiring cover.
Remove the tapes (4 places) on the main unit.
Bottom side
Screw
Wiring cover
Tape (4 places)
(3) Remove the screws (4 pieces).
(Note: Do not remove the control box.)
Bottom side
WARNING
CAUTION
CAUTION
Bottom side
Control box
At time of shipment
(2) Remove the screws (2 pieces) to remove the
(4) Remove the screws (4 pieces) to remove the
Control box
Screw
Screw
- (06 - 32) -
Control box
Positioning after change
control box cover.
Bottom side
bottom panel.
Screw
Bottom side
Bottom side
Control box cover
Screw
Screw
Bottom
panel
6. SYSTEM DESIGN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents