Installation; Outdoor Unit; Opening A Knockout Hole - Fujitsu AUYG07LVLA Design & Technical Manual

Hide thumbs Also See for AUYG07LVLA:
Table of Contents

Advertisement

3.

INSTALLATION

3-1.

OUTDOOR UNIT

OPENING A KNOCKOUT HOLE

Be careful not to deform or scratch the panel while opening the knock out holes.
To protect the piping insulation after opening a knock out hole, remove any burrs from the edge of
the hole.
It is recommended to apply rust prevention paint to the edge of the hole.
Pipes can be connected from 4 directions, front, lateral side, rear side and bottom. (Fig. A)
When connecting at the bottom, remove the service panel and piping cover on the front of the
outdoor unit, and open the knock out hole provided at the bottom corner of the piping outlet.
It can be installed as shown on "Fig. B" cutting out the 2 slits as indicated on "Fig. C". (When
cutting slits, use a steel saw.)
Fig. A
Service panel
Front
Front
connection
Fig. B
Slit
Slit
CAUTION
Lateral
Rear
Lateral
connection
Fig. C
Bottom
connection
(No.2)
- (06 - 27) -
Bottom
Rear
connection
connection
(No.1)
6. SYSTEM DESIGN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents