Omron 8025G Maintenance Manual page 29

Crt terminal
Table of Contents

Advertisement

INSTALLATION AND CHECKOUT
SECTION 2
Every 8025 CRT terminal is fully inspected and tested before shipment to
ensure that it meets specifications.
It is packaged for safe transit under normal
freight-handling conditions.
The terminal should normally arrive ready for use.
Claims with the carrier should be filed within 15 days from delivery.
OMRON therefore recommends that you unpack and test the terminal upon receipt.
Terminal installation should be made as outlined in this section.
2.1
UNPACKING PROCEDURE
2.1.1
Inspection
Before unpacking the terminal, inspect the shipping container for signs of
Possible damage to the unit during transit.
2.1.2
Unpacking
Set the crate "Right End Up" and use a knife blade, 1/4" or less long, to
open the top of the crate.
Save the shipping container and packing materials in
case the terminal must someday be returned to OMRON or shipped to a repair facility.
"--~--,.
-+---
..
!. .. - -
--
.--
..
~-
..
----.-------~
CABINET
SCREWS
Figure 2-l.
Cabinet mounting screws (front).
2-1

Advertisement

Table of Contents
loading

Table of Contents