Outside Plant 2Base-Tl Primary Protectors; Figure 4-6 Installation Of A 50 Pin 2Base-Tl Cable - Hatteras HN4000 Hardware Installation Manual

Table of Contents

Advertisement

4-8
Cabling 2BASE-TL Ports
Step  2. To secure the cable, pass a tie‐wrap through the connector's tie‐wrap mount and 
secure the tie wrap around the Champ connector shell (Figure
Figure 4-6
Installation of a 50 Pin 2BASE-TL Cable
Step  3. Dress the 2BASE‐TL cable to the right of the HN4000 and through the lower cable‐
guide slot in the right‐side mounting bracket. 
Step  4. Terminate other end of cable per customer requirements.

4.3.1 Outside Plant 2BASE-TL Primary Protectors

The HN4000 is expected to be installed with primary protectors on the outside plant 2BASE-TL copper
pairs. The primary protectors should have a voltage limiting capability of approximately 600V at
1000V/µs.
Caution
Hatteras Networks recommends a primary protector with characteristics similar to the Bourns
455HS-BC as shown in the following table. In addition to its protection capabilities, the 455HS-BC is
well balanced for use in 2BASE-TL applications.
HN4000 Hardware Installation Guide
Characteristic
DC Breakdown
AC Breakdown @ 60Hz
Impulse Breakdown @ 100V/μs
Impulse Breakdown @ 1000V/μs
Insertion Loss @ 100MHz
Return Loss @ 100MHz
Tip & Ring to Ground Capacitive Balance
Line to Line Capacitance @ 1MHz
Line to Ground Capacitance @ 1MHz
4‐6).
Value
400 V
400 V
600 V
650 V
< 0.4 dB
> 14 dB
≤ 1 pF
10 pF typical
20 pF typical
920550-5020 Rev 14