E
Installation checklist
Overview
Purpose
This chapter provides the recommended checklist to follow when installing a Alcatel-
Lucent 1665 Data Multiplexer (Alcatel-Lucent 1665 DMX) system. Use of the installation
checklist is required to ensure a quality installation, all completed tasks should be checked
off and those not completed should be duly noted as to the reason why. This checklist
should be turned in as part of your job complete paperwork.
Table E-1 Installation acceptance checklist
Section and Chapter
Part I: "Physical installation and powering"
Chapter 1, "Equipment and
cable installation"
............................................................................................................................................................................................................................................................
365-372-304R7.1
Issue 2 March 2008
Procedure
Inspection (p. 1-8)
Alcatel-Lucent 1665 DMX High-Capacity
shelf installation (p. 1-9)
Heat baffle installation (p. 1-14)
Power cable and cable bracket installation (p.
1-16)
Fiber management installation (optional) (p.
1-27)
Installing the fiber ducts (optional) (p. 1-31)
Cable and optical fiber installation (p. 1-32)
DS1 cable installation (p. 1-34)
Completed
Required
Yes
No
Yes
Yes
See Note 1
Yes
Yes
See Note 1
Yes
See Note 1
E - 1