When the new network addresses are configured at the director, the message Request
completed OK appears at the bottom of the HyperTerminal window.
13.Select Exit from the File menu.
A HyperTerminal dialog box appears
Figure 19
HyperTerminal dialog box (1)
14.Click Yes.
A second HyperTerminal dialog box appears
Figure 20
HyperTerminal dialog box (2)
15.Click No to exit and close the HyperTerminal application.
16.Power off the maintenance terminal:
a. Select Start > Shut Down.
The Shut Down Windows dialog box appears.
b. Select Shut down and then click OK to power off the PC.
17.
Disconnect the RS-232 null modem cable from the director and the maintenance terminal.
Replace the protective cap over the maintenance port.
18.IPL the director.
LAN-connect the director
Use these steps to connect the rack-mounted director to the Ethernet LAN segment.
44
Installing and configuring the director
(Figure
19).
(Figure
20).