Inserting The Rear Cage Nuts In The Rack; Finalizing The Rack-Mounting Procedure; Installing The Director In The Rack; Securing The Front Mounting Brackets To The Rack - HP StorageWorks Director 2/140 Installation Manual

Hide thumbs Also See for StorageWorks Director 2/140:
Table of Contents

Advertisement

1.
Select one of the exterior vertical rails at the front of the cabinet. From the bottom of the shelf
bracket, count up 3U (9 holes) and insert the first of three cage nuts.
2.
Count up 3U (9 holes) from the cage nut you just installed and insert the next cage nut.
Count up 3U (9 holes) from the second cage nut and insert the third cage nut.
3.
4.
To install cage nuts in the other front rail, repeat

Inserting the rear cage nuts in the rack

Use these steps to insert the six (6) supplied cage nuts in the rack's rear rails.
1.
Select one of the exterior vertical rails at the rear of the cabinet. From the bottom of the shelf
bracket, count up 3U (9 holes) and insert the first of three cage nuts.
2.
Count up 4U (12 holes) from the cage nut you just installed, and insert the next cage nut.
3.
Count up 4U (12 holes) from the second cage nut and insert the third cage nut.
4.
To install cage nuts in the other rear rail, repeat

Finalizing the rack-mounting procedure

After completing the steps outlined in the previous section, prepare to orient the Director 2/140 in
the rack as described in the following sections. The procedure requires two technicians.
CAUTION:
The director weighs approximately 167 lbs. Do not attempt to lift or carry the director
with fewer than two people. Failure to observe this CAUTION may result in injury to personnel or
damage to the director.

Installing the director in the rack

Use these steps to maneuver the Director 2/140 into the rack:
Using a lift device, position the Director 2/140 at the front of the cabinet.
1.
2.
If necessary, adjust the lift height so that the bottom of the Director 2/140 is parallel with the
shelf mounts in the rack.
3.
Slide the director along the shelf mounts and into the cabinet until the front mounting brackets on
the Director 2/140 contact the front cabinet rails.

Securing the front mounting brackets to the rack

Follow this procedure to secure the front mounting brackets attached to the Director 2/140 to the
rack:
1.
Secure one of the front mounting brackets to a cabinet rail by attaching three (3) Phillips
panhead screws to the cage nuts you installed earlier.
2.
Repeat
step 1

Securing the rear mounting brackets to the rack

Follow this procedure to attach the Director 2/140 rear mounting plates to the rack using the rear
mounting bracket:
to secure the other front mounting bracket to the remaining cabinet rail.
step 1
through
step
3.
step 1
through
step
3.
Director 2/140 installation guide
37

Advertisement

Table of Contents
loading

Table of Contents