Power-On Self Test; Configure Director Network Information; Default Settings; Aligning The Switch In The Rack - HP StorageWorks Director 2/140 Installation Manual

Hide thumbs Also See for StorageWorks Director 2/140:
Table of Contents

Advertisement

NOTE:
To ensure redundancy, install a second, optional PDU; and connect each PDU power cord
to a separate PDU. Note that the Director 2/140 does not have a power switch. Therefore, the
Director 2/140 powers on when its power cords are connected to facility power.
Figure 13
AC power connections (director)

Power-on self test

Use the following steps to run a power-on self test (POST):
1.
Power on the PDUs (if used).
The director powers on. The following occurs during POST:
• Amber LEDs on both CTP cards and all UPM cards illuminate momentarily.
• The green LED on each CTP card (active and backup) turns O
UPM cards are tested.
• Green LEDs associated with Fibre Channel ports sequentially illuminate as the ports are
tested.
2.
After successful POST completion, the green power LED on the front bezel, green LED on the
active CTP card, and green PWR OK LEDs on both power supplies remain
3.
If a POST error or other malfunction occurs, refer to the HP StorageWorks Director 2/140
service manual.

Configure director network information

Use the following sections to configure the director's network addressing scheme.

Default settings

The director is delivered with the following default network addresses:
as the card is tested and
N
.
ON
Director 2/140 installation guide
39

Advertisement

Table of Contents
loading

Table of Contents