Installation and Setup

Learn how to install, connect, and optimize the projector display.

Site requirements

To safely install and operate the projector, the installation location must have restricted access for
authorized personnel only and meet these minimum requirements.

Physical operating environment

Provides specifications for the operating environment.
Maximum ambient temperature (operating) 35°C (95°F)
Minimum ambient temperature (operating) 10°C (50°F)

Power connection

Learn the requirements for permanently wired installations or power cord connections.
Single phase 10A IEC320C14 (lamp power supply to projector head)
or
Single phase 15A (North America)/10A (all other regions) power cord (projector head to AC
mains). The latter cord is provided for installations where the projector head is remotely
lcoated from the lamp power supply (LPS) and must be powered directly from the AC mains
instead of the LPS.
Terminal block, electrician hard-wired at the projector headlamp power supply (LPS).
Three-phase, 39A 200-230VAC + Earth (North America and Japan)
or
Three-phase, 26A 380-415VAC + Neutral + Earth (regions outside North America and Japan)
This product can be connected to an IT power distribution system.

Tools required for installation

Make sure the following tools are available during the installation:
12" screwdrivers: Phillips #2 (magnetic) and flat
19 mm and 7/8" wrenches
Assorted Allen keys (metric)
Roadie 4K35 Quick Start Guide
020-101671-04 Rev. 1 (01-2016)
Copyright
2016 Christie Digital Systems USA Inc. All rights reserved.
©
13

Advertisement

Table of Contents
loading

Table of Contents