3 - 4
3.4
First Time Operators
The following sequences of operation should be used by first time operators and by
operators that use the equipment occasionally. For regular users, familiar with the
equipment, go to section 3.5. Set the power supply switch to OPERATE and the power-
up routine starts.
(1)
The display, on the front panel or hand-terminal, shows:
DK126
Display Power Up
Please Wait
(2)
After a short time the display shows:
Note:
Where x is the current issue number of the software.
(3)
Last Calibration
dd/mm/yy (dmy)
RPT Transducer
PLEASE WAIT
Note:
Date format can be changed in configuration.
For units fitted with the Solartron transducer, the display shows Solartron Transducer in
place of RPT Transducer.
(4)
K114 Issue No. 9
Iss 1.xx
DRUCK
ADTS 405
DK263
VER 6.xx
Self Test
PLEASE WAIT
Operation