Operation; Preparation - GE Druck ADTS 405 User Manual

Air data test system
Hide thumbs Also See for Druck ADTS 405:
Table of Contents

Advertisement

Druck ADTS 405 User Manual
3

OPERATION

3.1

Preparation

WARNING:
OBSERVE SAFETY PRECAUTIONS STATED IN LOCAL ORDERS AND THE
AIRCRAFT OR EQUIPMENT SERVICING PROCEDURES.
Make sure the electrical and pneumatic connectors, electrical cables and pipes and
positioning of the ADTS 405 comply with the instructions and requirements in Section 2
Installation.
Carry out the following before use:
If necessary, carry out the maintenance task detailed in Section 4.
Make sure the air data test system power supply switch on the front panel is set
to OFF. Connect the air data test system to the electrical supply, make sure the
supply includes a connection to a protective earth.
Inspect the pneumatic hoses for damage, ingress of dirt and moisture. Make
sure the aircraft adaptors are serviceable.
Connect, to the air data test system, the hoses necessary for the test procedures to be
carried out: red hose to the STATIC output (Ps), blue hose to the PITOT output (Pt).
Temporarily seal the free ends of the hoses.
Note: When connected, take care not to kink or stand on the hoses.
Connect the hand terminal to the air data test system through the HAND TERMINAL
connector on the front panel. If necessary, connect the hand terminal through the
extension cable.
Before use, the ADTS 405 should be tested, for first time users see section 3.4, for users
requiring more operating detail see section 3.5.
This section contains a quick reference chart showing all the functions of the key-pad.
Further quick reference charts show the set-up and configuration settings for each
key-pad function.
Review and become familiar with the whole procedure before starting the test process
on an aircraft or component.
3 - 1
3
K114 Issue No. 9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents