Yamaha FJR1300AS(X) Service Manual page 113

Hide thumbs Also See for FJR1300AS(X):
Table of Contents

Advertisement

1. Windshield drive unit
2. Thermistor
3. Windshield drive unit lead
4. Meter assembly lead
5. Left auxiliary light lead
6. Left headlight beam adjusting cable
7. Left headlight lead
8. Right headlight lead
9. Right headlight beam adjusting cable
10. Turn signal/hazard relay
11. Right auxiliary light lead
12. Front cowling wire harness
13. Thermistor lead
A. To wire harness
B. Fasten the front cowling wire harness to the stay
on the accessory box with a plastic locking tie as
shown in the illustration, making sure to position
the tie below where the headlight leads branch off
from the harness. Face the end of the plastic
locking tie rearward, along the side of the
accessory box. Do not cut off the excess end of the
plastic locking tie.
C. Less than 20 mm (0.79 in)
D. Pass the windshield drive unit lead through the
hole in the windshield drive unit/meter assembly
stay.
E. Route the meter assembly lead under the
windshield drive unit.
F. Route the left headlight beam adjusting cable
under the left headlight lead.
G. Secure the plastic band by inserting the projection
on the band into the hole in the front of the
windshield drive unit/meter assembly stay, and
then fasten the front cowling wire harness with the
band after the headlight lead branches off from the
harness.
H. Secure the front cowling wire harness at the
location shown in the illustration by inserting the
projection on its holder into the hole in the
windshield drive unit/meter assembly stay.
I.
Fasten the leads (to windshield drive unit) that
branch off from the front cowling wire harness to
the harness with a plastic locking tie, making sure
to position the tie 20 mm (0.79 in) from the drive
unit couplers.
J. Secure the plastic band by inserting the projection
on the band into the hole in the front of the
windshield drive unit/meter assembly stay, and
then fasten the front cowling wire harness with the
band before the headlight lead branches off from
the harness.
K. Fasten the thermistor lead to the front cowling wire
harness with a plastic locking tie, making sure to
align the tie with the tape used to fasten the front
right turn signal light lead. The thermistor lead
should not be taut.
L. To front right turn signal light, right horn (high), and
wire harness
M. Route the right headlight beam adjusting cable
between the right headlight lead and the thermistor
lead.
N. Position the plastic locking tie 25 mm (0.98 in) to
the right of the center of the front cowling as shown
in the illustration.
CABLE ROUTING (FJR1300A)
O. Fasten the thermistor lead with a plastic locking tie,
and then cut off the excess end of the tie. Be sure
to fold the protective sleeve against the lead to
remove any space between the sleeve and the
lead when fastening it.
P. Secure the plastic locking tie by inserting the
projection on the tie into the hole in the rear of the
windshield drive unit/meter assembly stay.
2-62

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Fjr1300a(x)

Table of Contents