Removing And Replacing The A60-A63 70 Ghz Doublers - Keysight N5227A Service Manual

2-port and 4-port pna microwave network analyzer 10 mhz - 67 ghz
Table of Contents

Advertisement

Repair and Replacement Procedures
Removing and Replacing the A60–A63 70 GHz Doublers
Removing and Replacing the A60–A63 70 GHz Doublers
Tools Required
• T-10 TORX driver (torque to 9 in-lb or 1.02 N.m)
• T-20 TORX driver (torque to 21 in-lb or 2.38 N.m)
• 5/16 inch open-end torque wrench (torque to 10 in-lb or 1.13 N.m)
• ESD grounding wrist strap
Removal Procedure
Refer to
Figure 7-19
for this procedure.
CAUTION
Be careful not to damage the center pins of the semirigid cables. Some flexing of the cables
is necessary to remove the assembly. However, do not over-bend the semirigid cables.
1. Disconnect the power cord.
2. Remove the outer cover. Refer to
3. Position the analyzer bottom side up.
4. Remove the brace (item
4-port models, also remove the brace (item
semirigid cables).
5. The 70 GHz doublers and the mounting brackets to which they are attached, must be removed as a
complete assembly. 
Disconnect all semirigid cables (item
removed.
6. Disconnect the ribbon cable (item
7. Remove six screws (item
8. Move the disconnected semirigid cables out of the way and lift the doubler mounting bracket, with the
two doublers attached, out of the analyzer just enough to allow the gray flexible RF cables (item
be disconnected. It may be necessary to loosen the connector at the other end of some of the semirigid
cables to allow them to be moved enough.
Note the locations of each of the gray flexible cables for reconnection later. Disconnect these cables
and remove the doubler mounting bracket, with the two doublers attached, from the analyzer.
9. Remove three screws that attach the doubler to be replaced to its mounting bracket, and remove the
doubler from the bracket.
Replacement Procedure
1. Reverse the order of the removal procedure.
7-44
"Removing the Covers" on page
) connected to the 70 GHz doublers mounting bracket to be removed. For
) that partially covers the front cable bracket (for 4
) from each 70 GHz doubler on the mounting bracket to be
) from each doubler.
) that attach the doubler mounting bracket to the test set deck.
PNA Series Microwave Network Analyzers
7-6.
Service Guide N5227-90001
N5227A
) to

Advertisement

Table of Contents
loading

Table of Contents