Completion Of The Measurement - Swann AMI Powercon Operator's Manual

Table of Contents

Advertisement

AMI Powercon
Maintenance
6.8.5
A-96.250.341 / 061015
If QA-Check is not successful it is recommended to clean the sen-
sor, see
Maintenance of the Sensor, p.
contact your local SWAN distributor for support.

Completion of the measurement

1 Stop the sample flow to the AMI Powercon by closing the appro-
priate valve, e.g. back pressure regulator, sample preparation
or flow regulating valve at flow cell again.
2 Close flow regulating valve of the AMI Inspector.
3 Disconnect the AMI Inspector by removing the tubes and con-
nect the sample outlet of the Monitor AMI Powercon to the sam-
ple outlet funnel again.
4 Start sample flow again and regulate sample flow.
5 Shutdown AMI INSPECTOR Conductivity.
For longer stop of operation see manual of AMI INSPECTOR Con-
ductivity
44. If QA-Check fails again
57