AMI Powercon
Maintenance
6.8.4
56
Carry out comparison measurement
The comparison measurement is menu driven. Start by selecting
Quality assurance in menu 3.4 of the monitor AMI Powercon
1 Navigate to menu Maintenance /Calibration.
2 Press [Enter].
3 Follow the dialog on the Display.
Quality Assurance
- carry out preparations
- install Inspector
- sample flow to 10 l/h
<Enter> to continue
Quality Assurance
Value Cond.
0.078
Value Temp.
Wait 10 Minutes
<Enter> to continue
Quality Assurance
Value Cond.
0.078
Value Temp.
Inspector Cond
0.073
Inspector Temp.
<Enter> to continue
Quality Assurance
Value Cond.
0.078
Value Temp.
Inspector Cond.
0.073
Inspector Temp.
<Enter> to continue
Quality Assurance
Max. Dev. Cond
Max. Dev. Temp.
Dev. Cond
Dev. Temp.
QA-Check succesful
4 Carry out pre test preparations
3.4.5
Connect instruments.
Regulate sample flow to 10 l/h us-
ing the appropriate valve.
5 Wait 10 minutes whilst measure-
3.4.5
ment is running.
S
Press [Enter] to continue.
25 C
6 Read the S value of the reference
3.4.5
instrument and enter under "In-
S
spector." by using the [
24.8 C
[
S
25 C
7 Press [Enter] to confirm.
8 Read temperature value of the ref-
3.4.5
erence instrument and enter un-
S
der "Inspector Temp." by using the
24.8 C
[
S
25 C
9 Press [Enter] to confirm.
10 Press [Enter] to continue.
The results are saved in QA-
3.4.5
History regardless if successful
0.5 %
or not
0.4
0.1 %
0.16
] keys.
] or [
] keys.
A-96.250.341 / 061015
] or