Swann AMI Powercon Operator's Manual page 57

Table of Contents

Advertisement

AMI Powercon
Maintenance
A-96.250.341 / 061015
A
Monitor AMI Powercon
B
Online flow cell
C
AMI Inspector Conductivity
1 Stop sample flow to the monitor AMI Powercon by closing the
appropriate valve, e.g. back pressure regulator, sample prepa-
ration or flow regulating valve at flow cell.
2 Connect sample line of the Monitor AMI Powercon [A] with the
sample inlet of the reference instrument AMI INSPECTOR Con-
ductivity. Use the supplied tube, made of FEP.
3 Connect sample outlet of the reference instrument
AMI INSPECTOR Conductivity to the sample outlet funnel of
the monitor.
4 Switch on AMI INSPECTOR Conductivity. Open the flow regu-
lating valve and regulate the sample flow to 5-10 l/h. The actual
flow is shown on the transmitter.
A
B
C
D
E
F
D
Reference flow cell
E
Sample inlets withe T-fitting
F
Sample outlets
55

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents