Maintenance Of The Sensor; Remove The Sensor Form The Flow Cell; Install The Sensor Into The Flow Cell - Swann AMI Powercon Operator's Manual

Table of Contents

Advertisement

AMI Powercon
Maintenance
6.3.
6.3.1
Cleaning
6.3.2
44

Maintenance of the Sensor

A
B
C
D

Remove the Sensor form the Flow Cell

To remove the sensor form the flow cell proceed as follows:
1 Press the locking pin [G] down.
2 Turn the locking screw [H] with a 5 mm allen key counterclock-
wise 180°.
The locking pin remains down.
3 Remove the sensor.
If the sensor is slightly contaminated, clean it with soapy water and
a pipe cleaner. If the sensor is strongly contaminated, dip the tip of
the sensor into 5% hydrochloric acid for a short time.

Install the Sensor into the Flow Cell

1 Make sure that the locking mechanism is in unlocked position
(locking pin in position [G] and security screw in position [H]).
2 Put the sensor into the flow cell with the alignment marks [E] in
line.
3 Turn the locking screw with a 5 mm allen key clockwise 180°.
The locking pin moves up in lock position.
A
Blind plug
B
Locking pin locked
C
Locking screw closed
D
Flow cell
E
Alignment marks
E
F
Conductivity sensor
G
Locking pin unlocked
F
H
Locking screw open
G
E
H
A-96.250.341 / 061015

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents