Completion Of The Measurement - Swann AMU-II ph/Redox Operator's Manual

Table of Contents

Advertisement

AMU-II pH/Redox
Maintenance
6.4.5
A-96.150.441 / 230523

Completion of the measurement

1 Stop the sample flow to the AMU-II pH/Redox by closing the ap-
propriate valve, e.g. back pressure regulator, sample preparation
or flow regulating valve at flow cell again.
2 Close flow regulating valve of the AMI Inspector.
3 Disconnect the AMI Inspector by removing the tubes and connect
the sample outlet of the Monitor AMU-II pH/Redox to the sample
outlet funnel again.
4 Start sample flow again and regulate sample flow.
5 Shut down AMI Inspector pH.
45

Advertisement

Table of Contents
loading

Table of Contents