Eaton Powerware Prestige Series 1500 VA Installation And Operator's Manual page 5

Table of Contents

Advertisement

Q
I
UICK
NSTALL
120V Model Installation
1
If you are connecting the UPS to an AS/400, the QUPSDLYTIM system value for the UPS
Monitoring feature should be set. See "UPS Monitoring" on page 54 for instructions.
2
3
For the AS/400 interface, plug the AS/400 communications cable into the serial port on the
UPS rear panel. Plug the other end of the cable into the connector, located on the back of
the system unit, labeled "UPS" (AS/400 Models 2xx/4xx/170).
4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerware prestige series 650 va

Table of Contents