Selecting An Installation Option; Ups And Battery Cabinet Installation - Eaton Powerware Prestige Series 1500 VA Installation And Operator's Manual

Table of Contents

Advertisement

Installation

Selecting an Installation Option

In addition to the standard Prestige, the unit has two optional
PowerPass Distribution Modules. Use the following flow chart to decide
which installation option is right for you.

UPS and Battery Cabinet Installation

Use the following procedure to install the UPS and optional battery
cabinets:
36
Powerware
®
Prestige Series Installation and Operator's Manual for IBM Applications (650 VA - 1500 VA) Uncontrolled Copy
Do you have an
optional PPDM?
See the following
section, "UPS and
Battery Cabinet
Installation."
1. Place the UPS near the equipment to be protected. The UPS
should be well ventilated and away from direct sunlight or
other heat source.
Steps 2 through 7 are for battery installation. If you do not have
optional battery cabinets, skip to "UPS Startup for 120V
Models" on page 38 or "UPS Startup for 208V-240V Models" on
page 39.
You can install additional battery cabinets while the UPS is
operating, but confirm the UPS is not in Battery mode (see
page 51).
2. Place the battery cabinets underneath or beside the UPS as
shown in Figure 4.
NOTE For stacked cabinets, do not place more than three battery cabinets in one
stack. The UPS cabinet must be placed on top of the battery cabinets.
See "UPS with
Yes
Optional PPDM
Installation" on
page 41.
No