Installation; Unpacking And Inspection; Ups And Battery Cabinet Storage - Eaton Powerware Prestige Series 1500 VA Installation And Operator's Manual

Table of Contents

Advertisement

C H A P T E R 3
I
NSTALLATION
The following sections describe UPS storage requirements and the
installation and startup of the UPS.

Unpacking and Inspection

Carefully unpack the UPS and optional battery cabinets, making sure to
retain the packaging materials. Examine each unit carefully for any signs
of damage and immediately notify your distributor if damage is present.
For assistance with the IBM 9910 UPS, see Chapter 8, "AS/400 Service"
on page 77.

UPS and Battery Cabinet Storage

If you plan to store the UPS or battery cabinets prior to use, store them
in a cool, dry environment. Storage temperature should not exceed
35
energize the UPS and battery cabinet for approximately 8 hours every
90 days in order to maintain battery charge.
Whenever the units are not energized, verify the circuit breaker on all
battery cabinets is returned to the OFF (O) position (see Figure 5 on
page 38).
Powerware
®
Prestige Series Installation and Operator's Manual for IBM Applications (650 VA - 1500 VA) Uncontrolled Copy
C (95
F) in order to preserve battery life. For longer term storage,
35

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerware prestige series 650 va

Table of Contents