Panasonic CS-VZ9SKE Service Manual page 162

Hide thumbs Also See for CS-VZ9SKE:
Table of Contents

Advertisement

18.3.7 Removing the Compressor and Aluminium Electric Heater (Heatcharge)
1
Perform "17.2.1 Removing the Outer Top Panel and Outer Front Panel".
2
Perform "17.2.2 Removing the Electrical Component Covers (2 & 3-way valve Cover and Terminal Plate
Cover)".
3
Perform "17.2.3 Removing the Power Supply Box".
4
Perform "17.2.6 Removing the Outer Side Panel (Right)".
5
Remove the 4-way valve coil, expansion valve coil, 3-way valve coil (Aluminium Electric Heater).
6
Remove the fixing screw of the acoustic insulation board and holder plate for 3-way valve & expansion valve
(2 pieces on the right side and 1 pieces at the front bottom). Then, disengage the tab on the acoustic
insulation board (2 location on the holder plate 3-way valve & expansion valve and 1 location on the bottom
side).
7
Remove the holder plate for 3-way valve & expansion valve from acoustic insulation board.
8
Remove the fixing screw of the earth wire (yellow/green) at the acoustic insulation board.
Acoustic insulation board
4-way valve coil
Earth wire
fixing screw
Fixing screw of
acoustic insulation board
9
Remove the acoustic insulation board.
Fixing screw of acoustic insulation board
& holder plate of 3-way valve & expansion valve
Expansion valve coil
3-way valve coil
162
Tab

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cu-vz9skeCu-vz12skeCs-vz12ske

Table of Contents