Johnson J10RLSRD Service Manual page 204

Table of Contents

Advertisement

Apply Permatex No. 2 to the two ribs in the cylin-
der head next to thermostat water passage.
1
1
Lightly coat both sides of a new cylinder head
gasket with Gasket Sealing Compound. Install the
gasket and cylinder head. Tighten the cylinder
head screws in stages to the final torque of 216 to
240
in.
Ibs. (24 to 27 N·m), following the sequence
shown. Install the cylinder head screws dry. Do
not use sealant on threads.
3
- - - - 4
2
1
6
5
Torque Sequence
32448
POWERHEAD
ASSEMBLY - 9.9/15
Install the thermostat assembly (and temperature
switch, if equipped) in the cylinder head.
Install thermostat cover and O-ring. Torque
screws 60 to 84 in. Ibs. (7 to 9 N·m).
Apply Gasket Sealing Compound to both sides of
two new exhaust cover gaskets. Install the inner
and outer exhaust covers. Tighten the screws to a
torque of 95 to 130
in.
Ibs. (11 to 14 N·m), starting
with the center screws.
I
32388
203
E
o
U
Qj
)(
~
Qj
~
ii
E

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents