Nortel Server 1005r Maintenance And Diagnostics page 128

Nortel networks network device maintenance and diagnostics
Hide thumbs Also See for Server 1005r:
Table of Contents

Advertisement

Replacing basic chassis components
Result: The board replacement is complete.
25
Test the system to ensure the new board is functioning properly.
For instructions, see "Testing the CallPilot installation" in the
Installation and Configuration Task List (555-7101-210).
128
Standard 1.10
CallPilot

Advertisement

Table of Contents
loading

Table of Contents