Nortel Server 1005r Maintenance And Diagnostics page 113

Nortel networks network device maintenance and diagnostics
Hide thumbs Also See for Server 1005r:
Table of Contents

Advertisement

June 2007
1
Depress and hold the green lever (A) to disengage the power
supply.
Figure 19: Power supplies
2
Grasp the black handle (B) and pull the power supply from the
chassis.
3
Insert the replacement power supply. When inserting the new power
supply, make sure the green handle (A) is pressed downward while
sliding the module into the power supply cage.
4
Plug the new power supply into the AC mains.
Result: The power supply LED illuminates green.
1005r Server Maintenance and Diagnostics
Replacing basic chassis components
113

Advertisement

Table of Contents
loading

Table of Contents