Installing The Stopper Assembly; Engine Mount Installation - Seagull Models ISPORTS 10cc Assembly Manual

Hide thumbs Also See for ISPORTS 10cc:
Table of Contents

Advertisement

ISPORT 10-15cc
INSTALL RUDDER CONTROL HORN.
Repeat steps to install the rudder control
horn as same as steps done for ailerons.
Rudder control horn.
Epoxy.
Rudder control horn.

ENGINE MOUNT INSTALLATION.

1) Locate the items necessary to install
the engine mount included with your
model.
8
M4x30mm
Instruction Manual.
2) Use four 4x30mm head bolts and four
4mm washers to attach the engine mount
rails to the firewall. Tighten the screws .
Make sure to use threadlock on the screws to
help prevent them from vibrating loose.
Thread locker glue.
INSTALLING THE STOPPER
ASSEMBLY.
1) Using a modeling knife, carefully cut
off the rear portion of one of the 3 nylon
tubes leaving 1/2" protruding from the
rear of the stopper. This will be the fuel
pick up tube.
2) Using a modeling knife, cut one length
of silicon fuel line. Connect one end of
the line to the weighted fuel pick up and
the other end to the nylon pick up tube.
.

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ISPORTS 10cc and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents