How To Install C-Map Charts; How To Register The Etoken; How To Install The C-Map Database And Licenses - Furuno FMD-3200 Operator's Manual

Electronic chart display and information system
Hide thumbs Also See for FMD-3200:
Table of Contents

Advertisement

3. HOW TO MANAGE CHARTS
3.6

How to Install C-MAP Charts

Synchronize chart data before you install C-MAP charts, grouping the ECDIS units to
synchronize, otherwise the chart data cannot be shared. See the procedure in
section 3.22.1 for how to synchronize chart data. If C-MAP charts are not synchro-
nized after installation, delete all C-MAP charts, and do the above procedure again.
3.6.1

How to register the eToken

The eToken is a hardware mechanism (installed inside the PCU) used for password
authentication. Registration of the eToken is required only once, before you install the
C-MAP database.
1. Get into the Chart maintenance mode then click the [License] button on the
InstantAccess bar to show the [Licenses] dialog box.
2. Click the [C-MAP] tab to the show the [Licenses] dialog box for C-MAP.
3. Click the [C-MAP Setup] button.
4. You are asked if you are sure to continue; click the [OK] button to continue and
register the eToken.
Note 1: "CMAP: No connection to eToken" disappears from the Permanent warning
box after completion of the registration.
Note 2: You can show your C-
MAP system ID by clicking the
[C-MAP System ID] button on
the [Licenses] dialog box for C-
MAP.
3.6.2

How to install the C-MAP database and licenses

When you install the C-MAP database from a medium, all data is saved to the SSD.
Note 1: If several ECDIS units are installed, synchronize C-MAP charts among the
units after you have installed the database.
Note 2: The installation of a chart cannot be cancelled while it is in progress. If you get
an error message, try to install the charts again.
Note 3: Disable the Chart Alert function at the [Check Area] page of the [NAV Tools]
box (see section 8.2) before removing any C-MAP charts.
Note 4: The C-MAP database in the units selected for synchronization are synchro-
nized upon the successful completion of the database installation.
3-10
E-mail size
C-MAP system ID
appears here.
1MB▼

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fmd-3300Fmd-3200-bb

Table of Contents