How To Install The Control Unit - Furuno NAVpilot 711C Operator's Manual

Hide thumbs Also See for NAVpilot 711C:
Table of Contents

Advertisement

6.1.3

How to install the control unit

1. Detach the nut lock then unfasten the toothed nut.
2. Using the mount template at the back of this manual, open a mounting hole in the
installation site.
Note: According to the bulkhead thickness (d), the diameter of the mounting hole
changes as follows:
• d
• 10 mm < d
3. Attach the surface mount sponge to the mounting location.
Fit the notch of the sponge with the hole for the projection of the control unit to
prevent the sponge from blocking the hole.
4. Set the unit to the mounting hole.
The rear side of the control unit FAP-7011C
Control unit
Control unit
Nut lock
Nut lock
10 mm: Open a mounting hole of 90 mm in diameter.
20 mm: Open a mounting hole of 95 mm in diameter.
Surface mount sponge
Surface mount sponge
Toothed nut
Toothed nut
Notch
Notch
Hole for the projection
Hole for the projection
Mounting hole
Mounting hole
Mounting hole
Mounting hole
6. INSTALLATION AND WIRING
6-3

Advertisement

Table of Contents
loading

Table of Contents