Final Drive Gear Preload Adjustment - Suzuki GS850G Service Manual

Table of Contents

Advertisement

SHAFT DRIVE
When replacing the final drive gear,
replaw
[he
driven gear
also, as
they
must be
replaced
t o ~ e
f
her.
@
Fig. 8-2
I
Nut tightening torque
Final drive gear
coupling holder
Install the spacer and shims removed from
the old final
drive gear
on
the
newh eear.
FINAL DRIVE GEAR PRELOAD
Install gear into housing (Fig. 8-22)
ADJUSTMENT
After tightening the
final
drive
gear nut
to
specification,
measure
the bearing preIoad
9.0-1 1.0 kg-m
(65 .O-79.5
Fb-ft)
09924-645 10
Bearing 111stalEer
using special tool
O
with
a
'A"
x
' / d o
adapter
Socket. (Fig.
8-24)
099 1
3-845
I
0
NOTE:
Rofate the gear several /urns in
both
Preload torque
NOTE:
Always use a
new nut.
NOTE:
Coal /he
bearings
wifh Hypoid pear oil.
NOTE:
No o i l seal i s
insratled at [his point. Oil
seal i s
installed
afier bearing preload
i s
correct.
r
4.0-8.0
kg-cm
(3.4--6.9 Ib-in)
Install the other
inner
bearing
race,
the
washer and final
drive gear nut, and
tighten
to
specification, using
special
tool
Q Torque wrench
-
09900-2
1 107

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents