Wiring Guide - Wired Indoor Sensors - Honeywell TH8320R1003 Vision Pro 8000 Product Data

Hide thumbs Also See for TH8320R1003 Vision Pro 8000:
Table of Contents

Advertisement

®
VISIONPRO
8000 WITH REDLINK™
Wiring guide — Wired Indoor Sensors
Use the S1–S4 terminals for wired sensors.
Wiring 4 C7189U1005 sensors (10k ohm) for temperature
averaging network. Select 10K in the Installer Setup (ISU 503)
when using C7189U1005 sensor(s).
EIM
1
THE NUMBER OF C7189U SENSORS MUST BE
A SQUARE NUMBER (1, 4, 9, 16, ETC.)
Fig. 342. Wiring 4 C7189U sensors.
Wiring 2 TR21 sensors (20k ohm) and 1 TR21-A sensor (10k
ohm) for temperature averaging network. Select 20K in the
Installer Setup (ISU 503) when using 2 TR21 sensors and 1
TR21-A sensor.
EIM
Fig. 343. Wiring 2 TR21 sensors and 1 TR21-A sensor.
68-0312—01
1
C7189
C7189
C7189
C7189
M31472
TR21 A
T3
T4
TR21
TR21
M31473
Wiring 4 TR21 sensors (20k ohm). Select 20K in the Installer
Setup (ISU 503) when using TR21 sensor(s).
EIM
Fig. 344. Wiring 4 TR21 sensors.
Wiring 2 TR21-A sensors (10k ohm) for temperature averaging
network. Select 20K in the Installer Setup (ISU 503) when
using 2 TR21-A sensors in series. Note: The TR21-A sensor
must be used in combination with TR21 or TR21-A sensor.
EIM
Fig. 345. Wiring 2 TR21-A sensors.
134
TR21
TR21
TR21
TR21
M31474
TR21 A
T3
T4
TR21 A
T3
T4
M31475

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Th8321r1001 vision pro 8000Th8110r1008 vision pro 8000

Table of Contents